Archive for September, 2008

Lots of work this weekend

Posted in Our House on September 7th, 2008 by Giraffe Hunter

Front Door

The front doors arrived and are mostly installed.  The glass on the sidelights is not as big as I expected (see previous post), but they still look Great.  Work was halted due to the tropical storm that was unleashed right after the front of the house was torn off.  Hopefully we will get the trim finished this week.

The inside door was also replaced, this needs some touch up from ripping off the woodwork, but it looks and works so much better than the old one.

Back Door

I also plowed through on finishing up the back door.  Jeff helped out with the electrical and I went to town demolishing everything.  I am done building the Shoe holder that makes use of the crawl space under the kitchen.  Right now it works well for holding tools and keeping them out of my way, hopefully it does the same for all our shoes.

Here is a shot of the new Back door installed with the light we purchased when we bought the house also installed this week.

Visit the photo gallery for tons of work in progress photos.  House Work in Progress > Mud Room